Skip to main content
Conference Proceedings

MASSMIN 2000

Conference Proceedings

MASSMIN 2000

PDF Add to cart

Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for Gold'

WMC Limited, owner/operator of Olympic Dam, the world's largest underground uranium mine and the fourth largest underground copper mine has now completed an expansion that has been classed as a benchmark in the mining industry. To achieve a production increase from 3.4 to 9.25 Mtpa from an underground mining operation in two years was a major challenge, it was essential to review the overall materials handling system from the face to the stockpile'. The challenge was two-fold:How to deliver 30 000 tonne of ore per day to the processing plant, from a single underground mine? To provide the processing plant with a consistent metallurgical feed. This paper traces the transformation from the old to the new materials handling system at Olympic Dam.
Return to parent product
  • Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for Gold'
    PDF
    This product is exclusive to Digital library subscription
  • Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for Gold'
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1999
  • PDF Size: 0.97 Mb.
  • Unique ID: P200007065

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.