Conference Proceedings
MASSMIN 2000
Conference Proceedings
MASSMIN 2000
Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for Gold'
WMC Limited, owner/operator of Olympic Dam, the world's largest underground uranium mine and the fourth largest underground copper mine has now completed an expansion that has been classed as a benchmark in the mining industry. To achieve a production increase from 3.4 to 9.25 Mtpa from an underground mining operation in two years was a major challenge, it was essential to review the overall materials handling system from the face to the stockpile'. The challenge was two-fold:How to deliver 30 000 tonne of ore per day to the processing plant, from a single underground mine? To provide the processing plant with a consistent metallurgical feed. This paper traces the transformation from the old to the new materials handling system at Olympic Dam.
Contributor(s):
P Bowman
-
Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for Gold'PDFThis product is exclusive to Digital library subscription
-
Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for Gold'PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2000
- PDF Size: 0.97 Mb.
- Unique ID: P200007065