Skip to main content
Conference Proceedings

MASSMIN 2000

Conference Proceedings

MASSMIN 2000

PDF Add to cart

Mount Isa Mines - 1100 Orebody, 35 Years On

The Mount Isa Mines Copper Mine in Mount Isa started producing copper in 1966. The Copper Mine gradually increased production rates to nearly six million tonnes per year. Over the last three years the mine has been in a gradual ramp down due to the reduction of primary ore sources and head grade. The majority of ore sources are predominantly in pillar retreat sequences bounded by multiple fill masses. There also a substantial lower grade resource delineated to the south of the main orebody. These remaining ore sources present significant engineering challenges to obtain a safe and cost-effective extraction. Stope designs have become increasingly complex and require additional engineering and operations input and analysis. This paper describes the major planning and operational challenges and issues associated with the stope design and extraction of an orebody in the later stages of mine life.
Return to parent product
  • Mount Isa Mines - 1100 Orebody, 35 Years On
    PDF
    This product is exclusive to Digital library subscription
  • Mount Isa Mines - 1100 Orebody, 35 Years On
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1999
  • PDF Size: 1.917 Mb.
  • Unique ID: P200007060

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.