Conference Proceedings
MASSMIN 2000
Conference Proceedings
MASSMIN 2000
Open Stope Mining Strategies at Brunswick Mine
By 1996 ground control-related problems at Brunswick Mine had raised serious concerns regarding the safe and economical extraction of large portions of the reserves. These difficulties were mainly caused by high stress levels in pillars, instabilities resulting from wide spans supported by ageing support elements, and chronic difficulties supplying rock fill from the surface quarry to the underground workings, which resulted in many large voids remaining open for long periods of time. Significant changes have been implemented at the site since 1996, amongst which were a change of mining method, the introduction of paste backfill, the establishment of stress management measures, and the introduction of shotcrete on a large-scale. This paper focuses on the regional ground conditions associated with both the previously used primary-secondary mining method and the newly implemented pyramidal pillarless technique, as well as on some of the stress management measures implemented at the mine.
Contributor(s):
B Simser, P Andrieux
-
Open Stope Mining Strategies at Brunswick MinePDFThis product is exclusive to Digital library subscription
-
Open Stope Mining Strategies at Brunswick MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2000
- PDF Size: 1.089 Mb.
- Unique ID: P200007069