Skip to main content
Conference Proceedings

MASSMIN 2000

Conference Proceedings

MASSMIN 2000

PDF Add to cart

Study on Mining Method in Deep Position of Jinchuan Nickel Mine, China

Jinchuan nickel mine is the largest nickel mine in China. Cut-and-fill mining method with high density cementing materials is used in the mine. The original mining design divided the mining operation into two steps. The first step stopped the mining rooms and the second step stopped the pillars. Because the two-step method made big trouble for finally mining pillars and strongly limited the mining speed and production, it was successfully changed to a continuous cut-and-fill method without pillars. However, the mining operation in the mine has been down to 800 m and the mining condition is getting worse and more complicated. Through systemetical field investigations and 3D FEM analysis, it is proved that the mining method without pillars is feasible for mining deeper orebodies in Jinchuan nickel mine.
Return to parent product
  • Study on Mining Method in Deep Position of Jinchuan Nickel Mine, China
    PDF
    This product is exclusive to Digital library subscription
  • Study on Mining Method in Deep Position of Jinchuan Nickel Mine, China
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1999
  • PDF Size: 0.132 Mb.
  • Unique ID: P200007089

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.