Conference Proceedings
MASSMIN 2000
Conference Proceedings
MASSMIN 2000
The Mine Management System at Olympic Dam Mine
The operations management system at Olympic Dam has evolved over a two-year period to the state described in this paper. This evolution has been driven largely by the requirements of the recent expansion of the Olympic Dam operation from three to nine million tonnes of ore per year. Such a change process demands an holistic approach to mine management and several techniques have been employed including XPAC, Mine Works Planner as well as a basic philosophy of just-in-time' completion. The philosophies, software and tracking mechanisms for managing a large tonnage operation are described, outlining a fully integrated scheduling system from shift to shift detailed activity planning to a 20 year production plan. Moreover, the vision of production exceeding the current limit of nine million tonnes means that there are to be further developments to this state-of-the-art system in use at the Olympic Dam mine.
Contributor(s):
S Youds
-
The Mine Management System at Olympic Dam MinePDFThis product is exclusive to Digital library subscription
-
The Mine Management System at Olympic Dam MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2000
- PDF Size: 0.75 Mb.
- Unique ID: P200007064