Skip to main content
Conference Proceedings

MASSMIN 2000

Conference Proceedings

MASSMIN 2000

PDF Add to cart

The Pre-Undercut Caving Method at the El Teniente Mine, Codelco Chile

With conventional undercutting sequence the infrastructure on the production level often has a short serviceable life before major rehabilitation is necessary and is characterised by high maintenance costs. The abutment stress zone is the main cause of this situation. The application of the pre-undercut caving method variant can increase the availability and utilisation of the production level When a pre-undercut is used development and construction are carried out underneath a previously undercut area, far away from the abutment stress zone, under more favourable stress conditions. This paper describes the design principles and the relevant results from the application of the pre-undercut variant over three years to the Esmeralda sector of El Teniente mine. The aspects described are the undercut-extraction, the undercut-development and construction distances, the geometry and drawbells opening, cave extraction rates, and the rate and height of undercutting.
Return to parent product
  • The Pre-Undercut Caving Method at the El Teniente Mine, Codelco Chile
    PDF
    This product is exclusive to Digital library subscription
  • The Pre-Undercut Caving Method at the El Teniente Mine, Codelco Chile
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1999
  • PDF Size: 0.514 Mb.
  • Unique ID: P200007028

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.