Murrin Murrin CCD1 Rake Mechanism Modification - The Decision and the Result
Murrin Murrin Operations have not had a successful beginning. Numerous reliability and operability issues, many of which are the result of design decisions, have been addressed through mechanical and operational changes and the CCD circuit is no exception. Four design aspects of the CCD circuit that have caused and continue to cause operational problems are: the inclusion of solution neutralisation gypsum in the CCD circuit feed which was designed solely for HPAL residue without proper investigation of its impact on the achievable underflow density and resulting wash efficiency; the decision to construct the thickener base from thickened solids; the lack of redundancy in the overflow, underflow and tailings pipe work; and the lack of thickener operational flexibility in the central rake-lift and feedwell dilution system.In November 2002, the lack of operational flexibility in the rake-lift and the feedwell dilution system was improved through mechanical modification as follows: CCD1 rake mechanism was modified to allow central vertical lift of 600 mm; and CCD1 changed to forced dilution using the Outokumpu TurbodilRntechnology by replacing the E-DucnRtechnology of Eimco._x000D_
The installation and the results of the CCD1 rake-lift mechanism and feedwell dilution system changes are discussed in this paper._x000D_
FORMAL CITATION:Hewitt, B and Belke, J, 2004._x000D_
Murrin Murrin CCD1 rake mechanism modification - the decision and the result, in Proceedings Metallurgical Plant Design and Operating Strategies 2004, pp 375-398 (The Australasian Institute of Mining and Metallurgy: Melbourne).
The installation and the results of the CCD1 rake-lift mechanism and feedwell dilution system changes are discussed in this paper._x000D_
FORMAL CITATION:Hewitt, B and Belke, J, 2004._x000D_
Murrin Murrin CCD1 rake mechanism modification - the decision and the result, in Proceedings Metallurgical Plant Design and Operating Strategies 2004, pp 375-398 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
B Hewitt, J Belke
-
Murrin Murrin CCD1 Rake Mechanism Modification - The Decision and the ResultPDFThis product is exclusive to Digital library subscription
-
Murrin Murrin CCD1 Rake Mechanism Modification - The Decision and the ResultPDFNormal price $22.00Member price from $0.00