Secondary Grinding Circuit Optimisation for the Copper Concentrator of Mount Isa Mines
The Mount Isa Copper Concentrator was commissioned in 1973. In 1991, two autogenous grinding mills were installed replacing two stages of crushing, one stage of rod milling and one stage of primary ball milling. The cyclone overflow P80 of the secondary ball milling circuit was reduced to 120 microns due to the increased operating power in the AG/SAG mill circuits. A study of the mineralogy of the milled products and the plant flotation recovery indicated that the installed secondary grinding energy was more than what was required for adequate liberation of the chalcopyrite and half of it had potential for more effective use elsewhere._x000D_
Halving the secondary grinding energy meant only one of the two secondary ball mills would be needed. The predicted saving in operating cost of one less ball mill was more than two million dollars per annum. This paper summarises various plant trials that were conducted in the Copper Concentrator to decommission one of the two secondary ball mills._x000D_
FORMAL CITATION:Gao, M, Magee, M and Way, D, 2004._x000D_
Secondary grinding circuit optimisation for the copper concentrator of Mount Isa Mines, in Proceedings Metallurgical Plant Design and Operating Strategies 2004, pp 43-54 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Halving the secondary grinding energy meant only one of the two secondary ball mills would be needed. The predicted saving in operating cost of one less ball mill was more than two million dollars per annum. This paper summarises various plant trials that were conducted in the Copper Concentrator to decommission one of the two secondary ball mills._x000D_
FORMAL CITATION:Gao, M, Magee, M and Way, D, 2004._x000D_
Secondary grinding circuit optimisation for the copper concentrator of Mount Isa Mines, in Proceedings Metallurgical Plant Design and Operating Strategies 2004, pp 43-54 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
M Gao, M Magee, D Way
-
Secondary Grinding Circuit Optimisation for the Copper Concentrator of Mount Isa MinesPDFThis product is exclusive to Digital library subscription
-
Secondary Grinding Circuit Optimisation for the Copper Concentrator of Mount Isa MinesPDFNormal price $22.00Member price from $0.00