The Mina Serto Gold Project - From Drill Core to Production
Troy Resources NL acquired a 70 per cent interest in the Mina Serto gold project in Gois State, Brazil, in 2001 following a successful bid for the highly competitive international tender of a tenement package put out by Western Mining Corporation (WMC)._x000D_
The Serto deposit is located on cleared grazing land 380 km west of Brasilia and is 30 per cent owned by Amazonia Mineracao Ltda, a private Brazilian company. It is a small high grade open-pittable orebody with a measured and indicated resource of 108 000 tonnes at a grade of 49.7 g/t for 172 500 ounces using a 2.0 g/t cut-off._x000D_
Troy undertook the project management and development of the project while Amazonia managed the exploration activities and provided other services as required._x000D_
The project development involved drilling metallurgical test holes, scouring the world to locate an available and suitable second-hand plant, and arranging shipping to and reconstruction in Brazil._x000D_
FORMAL CITATION:Connelly, D, Nilsson, K and Cheong, G, 2004._x000D_
The Mina Serto Gold Project - from drill core to production, in Proceedings Metallurgical Plant Design and Operating Strategies 2004, pp 557-584 (The Australasian Institute of Mining and Metallurgy: Melbourne).
The Serto deposit is located on cleared grazing land 380 km west of Brasilia and is 30 per cent owned by Amazonia Mineracao Ltda, a private Brazilian company. It is a small high grade open-pittable orebody with a measured and indicated resource of 108 000 tonnes at a grade of 49.7 g/t for 172 500 ounces using a 2.0 g/t cut-off._x000D_
Troy undertook the project management and development of the project while Amazonia managed the exploration activities and provided other services as required._x000D_
The project development involved drilling metallurgical test holes, scouring the world to locate an available and suitable second-hand plant, and arranging shipping to and reconstruction in Brazil._x000D_
FORMAL CITATION:Connelly, D, Nilsson, K and Cheong, G, 2004._x000D_
The Mina Serto Gold Project - from drill core to production, in Proceedings Metallurgical Plant Design and Operating Strategies 2004, pp 557-584 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
D Connelly, K Nilsson, G Cheong
-
The Mina Serto Gold Project - From Drill Core to ProductionPDFThis product is exclusive to Digital library subscription
-
The Mina Serto Gold Project - From Drill Core to ProductionPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2004
- PDF Size: 3.748 Mb.
- Unique ID: P200404038