Skip to main content
Conference Proceedings

Metallurgical Plant Design and Operating Strategies (MetPlant) 2006

Conference Proceedings

Metallurgical Plant Design and Operating Strategies (MetPlant) 2006

Publication sale now on, get up to 70% off

PDF Add to cart

Murrin Murrin Heap Leaching Project

A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise stockpiled ore reject material (scats') and extract nickel and cobalt. Limited production from the demonstration plant is expected by the end of 2006. The demonstration plant will enable the company to fully investigate and understand all associated technical issues over the next 12 to 18 months, including the potential to expand the heap leaching operation to a commercial scale. In parallel, the MMJV will continue a research and development program to improve and expand the application of its heap leaching technology._x000D_
FORMAL CITATION:Readett, D, Meadows, N and Rodriguez, M, 2006. Murrin Murrin heap leaching project, in Proceedings Metallurgical Plant Design and Operating Strategies 2006, pp 367-372 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Murrin Murrin Heap Leaching Project
    PDF
    This product is exclusive to Digital library subscription
  • Murrin Murrin Heap Leaching Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2006
  • PDF Size: 0.239 Mb.
  • Unique ID: P200608030

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.