Preparation of Mine Fill from Process Plant Tailings
This paper reports the advances made during the development of underground mine fill technology from circa 1960 to the present and, in particular, indicates where increased input from process plant metallurgists - mainly milling, but also smelting - can contribute to further advances._x000D_
Fill types pertinent to the discussion are partially deslimed, partially dewatered mill tailings fill (uncemented, cemented) and paste fill. Pertinent process plant includes hydrocyclones, thickeners, filters, elutriation tanks, holding tanks, mixing mills, pumps and pipes. Control instrumentation is a critical component of each of the process plant units. The impact of smelter practice on filling is not considered in this paper, except to note that some smelter slags are, or have the potential to be, active pozzolans and when ground to the specific surface area of Portland cement can act as partial Portland cement replacements, a factor of economic and operating significance when Portland cement supply lines are considerable and/or tenuous._x000D_
The important role of process plant metallurgists has long been recognised, with Thomas, Nantel and Notley (1979) including them as one of the many categories of professionals with contributions to make. With the ever increasing sophistication of mine fill practice and its ever increasing acceptance as an essential component of the mining/milling/waste disposal process, the scope for contributions by the modern breed of highly educated, specifically trained process plant metallurgists is becoming ever increasingly obvious._x000D_
FORMAL CITATION:Thomas, E G, 2006. Preparation of mine fill from process plant tailings, in Proceedings Metallurgical Plant Design and Operating Strategies 2006, p 463 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Fill types pertinent to the discussion are partially deslimed, partially dewatered mill tailings fill (uncemented, cemented) and paste fill. Pertinent process plant includes hydrocyclones, thickeners, filters, elutriation tanks, holding tanks, mixing mills, pumps and pipes. Control instrumentation is a critical component of each of the process plant units. The impact of smelter practice on filling is not considered in this paper, except to note that some smelter slags are, or have the potential to be, active pozzolans and when ground to the specific surface area of Portland cement can act as partial Portland cement replacements, a factor of economic and operating significance when Portland cement supply lines are considerable and/or tenuous._x000D_
The important role of process plant metallurgists has long been recognised, with Thomas, Nantel and Notley (1979) including them as one of the many categories of professionals with contributions to make. With the ever increasing sophistication of mine fill practice and its ever increasing acceptance as an essential component of the mining/milling/waste disposal process, the scope for contributions by the modern breed of highly educated, specifically trained process plant metallurgists is becoming ever increasingly obvious._x000D_
FORMAL CITATION:Thomas, E G, 2006. Preparation of mine fill from process plant tailings, in Proceedings Metallurgical Plant Design and Operating Strategies 2006, p 463 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
E G Thomas
-
Preparation of Mine Fill from Process Plant TailingsPDFThis product is exclusive to Digital library subscription
-
Preparation of Mine Fill from Process Plant TailingsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2006
- PDF Size: 0.162 Mb.
- Unique ID: P200608037