Skip to main content

Publication sale now on, get up to 70% off

Conference Proceedings

MetPlant 2011

Conference Proceedings

MetPlant 2011

Publication sale now on, get up to 70% off

Add to cart
This is the seventh in the series of conferences on
Metallurgical Plant Design and Operating Strategies, reporting state-of-the-art
advances in metallurgical processing and plant design. This event again focused
on World's Best Practice', which was the theme of the 1998 conference Mineral
Processing and Hydrometallurgy Plant Design' (by the Australian Mineral
Foundation), at the beginning of the MetPlant series.
The papers in this volume strongly indicate that plant design continues to be
a high interest topic. The result is a proceedings that conveys a 2011 snapshot
of world's best practice, which will have ongoing relevance to the industry and
value to those in design, specification and operation of metallurgical
plants.

Papers in collection

  • Guidelines for Economic Evaluation of Projects Go to Paper
  • Keeping Projects on the Rails Go to Paper
  • Predicting Variations in Mill Feed Go to Paper
  • Setting Processing Plant Projects up for Success in Australia Go to Paper
  • Reducing Mining and Mineral Processing Plant Fatality Rates Go to Paper
  • Professional Development for Metallurgists - Improving Technical Skills Go to Paper
  • Differences between the Engineering Cultures of Australia and Brazil Go to Paper
  • Crushers - An Essential Part of Energy Efficient Comminution Circuits Go to Paper
  • Reducing the Energy Required in Grinding Clinker to Cement - Some Case Studies Go to Paper
  • The Importance of Evaluating Grinding Performance Go to Paper
  • Increasing Capacity and Efficiency of Grinding Circuits with High Frequency Screens Go to Paper
  • Recent Improvements to the Gravity Gold Circuit at Marvel Loch Go to Paper
  • In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine Go to Paper
  • Energy Efficiency Opportunities in Milling - Improving Comminution Circuit Efficiency Go to Paper
  • Non-Contact Acoustic Measurement of Dynamic In-Mill Processes for SAG/AG Mills Go to Paper
  • IsaMill Design Improvements and Operational Performance at Anglo Platinum Go to Paper
  • The Influence of Liner Wear on Milling Efficiency Go to Paper
  • Energy Efficiency Assessments in Design - Seminal Decisions and Effective Processes Go to Paper
  • Filtration Test Work - Extracting the Whole Story for Studies and Design Go to Paper
  • Sensible Cost Cutting for Resource Projects Go to Paper
  • Integrating Sustainability Principles into Mineral Processing Plant Design Go to Paper
  • Chirano Gold Mine Expansion - A Case Study Go to Paper
  • Engineering and Science in Flotation Cell Design Go to Paper
  • The Wonawinta Silver Project - Value Engineering at Work Go to Paper
  • An Approach to High Solids Slurry Pipeline Design Go to Paper
  • The Integration of Geometallurgy with Plant Design Go to Paper
  • Cost Effective Concentrator Design Go to Paper
  • We're Metallurgists, not Magicians!' Go to Paper
  • In-Pit Tailings - World's Best Practice for Long-Term Management of Tailings Go to Paper
  • Flotation Mechanism Design for Improved Metallurgical and Energy Performance Go to Paper
  • The Great Oil Debate - Does Quenching Oil have a Deleterious Effect on Flotation? Go to Paper
  • Carbon Prefloat Improvements at Century Mine Go to Paper
  • Quantifying Plant Flow Availability for an Alumina Refinery Expansion using Dynamic Simulation Go to Paper
  • Secondary Copper Processing using Outotec Ausmelt TSL Technology Go to Paper
  • Solvent Extraction of Uranium - Towards Good Practice in Design, Operation and Management Go to Paper
  • Fosterville Gold Mine Heated Leach Process Go to Paper
  • Leach Residue and Pregnant Liquor Separation - Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum Filtration Go to Paper
  • Agglomeration - The Key to Success for the Murrin Murrin Ni Laterite Heap Leach Go to Paper
  • Scale Suppression using Swirl Flow Technology Go to Paper
  • On-Belt Analysis at Sepon Copper Operation Go to Paper
  • The Casposo Gold-Silver Project - Process Selection and Design Go to Paper
  • Optimising Western Australia Magnetite Circuit Design Go to Paper
  • Contract Commissioning and Operation of Western Areas' Cosmic Boy Concentrator Go to Paper
  • Float it, Clean it, Depress it - Consolidating the Separation Stages at Clarabelle Mill Go to Paper
  • Flotation Process Control Optimisation at Prominent Hill Go to Paper
  • Ore Ageing Test Work for the Ok Tedi Skarns Go to Paper
PD Hours
Approved activity
  • Published: 2011
  • Unique ID: PA-201107

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.