Conference Proceedings
MetPlant 2011
Conference Proceedings
MetPlant 2011
Publication sale now on, get up to 70% off
Recent Improvements to the Gravity Gold Circuit at Marvel Loch
Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipment has a vital part in the overall effectiveness of the gravity gold circuit. There are a number of associated factors that need to be taken into consideration when selecting the most suitable equipment for gravity gold circuits including occupational health and safety, security and labour requirements. This paper is a case study that outlines the validation behind the design, selection of equipment and subsequent benefits of the recent upgrade of the gravity circuit at the Marvel Loch gold mine with the main component to the upgrade being the installation of a Consep Acacia Reactor. Since the upgrade there has been a significant increase in gravity recovery, which has reduced the amount of gold reporting to the leaching circuit therefore reducing reagent consumption and overall operating costs. There has been an increase in overall gold recovery and therefore increased gold production. The benefits to occupational health and safety include the removal of toxic gases being released in the gold room during the previous practice of gold concentrate calcination and the removal of the arsenic and nickel from the gold dor, which poses a risk during refining. Manual handling and security has improved as there is no physical contact with gold concentrates during the automated process using the Acacia reactor. The total time for gold room personnel working in the gold room has also reduced from around six hours per day to less than one hour per day.With the continuing development of low grade gold deposits, there will be an increase in demand for low capital, high recovery gravity gold circuits that can significantly increase overall production while reducing operating costs._x000D_
FORMAL CITATION:Bird, A and Briggs, M, 2011. Recent improvements to the gravity gold circuit at Marvel Loch, in Proceedings MetPlant 2011, pp 115-137 (The Australasian Institute of Mining and Metallurgy: Melbourne).
FORMAL CITATION:Bird, A and Briggs, M, 2011. Recent improvements to the gravity gold circuit at Marvel Loch, in Proceedings MetPlant 2011, pp 115-137 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
A Bird, M Briggs
-
Recent Improvements to the Gravity Gold Circuit at Marvel LochPDFThis product is exclusive to Digital library subscription
-
Recent Improvements to the Gravity Gold Circuit at Marvel LochPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2011
- PDF Size: 3.092 Mb.
- Unique ID: P201107012