Skip to main content

Publication sale now on, get up to 70% off

Conference Proceedings

MetPlant 2011

Conference Proceedings

MetPlant 2011

Publication sale now on, get up to 70% off

PDF Add to cart

Reducing the Energy Required in Grinding Clinker to Cement - Some Case Studies

Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-60 kWh/tonne depending on the clinker characteristics and the fineness of the finished cement. Machines used include single and multi compartment ball mills, HPGRs, vertical roller mills, centrifugal air separators, V separators, screens and crushers. The circuit most commonly used consists of a closed circuit HPGR followed by a single compartment ball mill and an air separator, and in operation the variables are adjusted to obtain maximum throughput with no loss of quality of the separator fines.A common objective in cement plants is to reduce energy consumption without affecting the particle size in the finished cement and simulation is used as one procedure to achieve this. Models are now available for all the machines commonly used in clinker circuits and circuit optimisation studies using simulation have been carried out in many plants leading to decrease in energy consumption per tonne of cement. In this paper the models used will be discussed briefly and several case studies will be reviewed which will highlight the effect of change in ball size in a two compartment mill, the role of the HPGR in an HPGR - ball mill - air separator circuit, and the use of a high intensity vibrating mill for producing finished cement with high additive ratio._x000D_
FORMAL CITATION:Benzer, H, Aydogan, N, Dundar, H and Lynch, A J, 2011. Reducing the energy required in grinding clinker to cement - some case studies, in Proceedings MetPlant 2011, pp 86-99 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Reducing the Energy Required in Grinding Clinker to Cement - Some Case Studies
    PDF
    This product is exclusive to Digital library subscription
  • Reducing the Energy Required in Grinding Clinker to Cement - Some Case Studies
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2011
  • PDF Size: 0.375 Mb.
  • Unique ID: P201107009

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.