Conference Proceedings
MetPlant 2013
Conference Proceedings
MetPlant 2013
Is an 80th Percentile Design Point Logical?
Clearly a plant designed only to treat average ore at the nameplate rate will fail to achieve nameplate in any typical year. To insert the necessary capability to achieve nameplate it is common process engineering design practice that plant must be able to treat an ore with 80th percentile value (hardness or competence values for example) at the nameplate rate. In the author's experience, apart from a couple of notable cases, this has been applied reasonably well as a principal, and with widespread success. However, in a number of recent instances it became clear that the use of the 80th percentile number would have resulted in significant under design of the plant. This paper makes the case that the 80th percentile, as a principal, has can have serious flaws and its use needs to be assessed on a case by case basis. The discussion in this paper is the first step in developing a new design principal, and the associated methodology for selection of a design value, that will ensure plants are designed to achieve their nameplate capacities.CITATION:David, D, 2013. Is an 80th percentile design point logical?, in Proceedings MetPlant 2013 , pp 6-12 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
D David
-
Is an 80th Percentile Design Point Logical?PDFThis product is exclusive to Digital library subscription
-
Is an 80th Percentile Design Point Logical?PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2013
- PDF Size: 0.251 Mb.
- Unique ID: P201305002