Skip to main content
Conference Proceedings

MetPlant 2013

Conference Proceedings

MetPlant 2013

PDF Add to cart

VertiMill - Development of Circuit Survey and Performance Evaluation Protocols

Approximately 420 VertiMills (VTM) have been installed in mineral processing plants throughout the world, mainly in tertiary and regrind applications plus several in secondary grinding duties. Metso Minerals (Metso) and the Julius Kruttschnitt Mineral Research Centre (JKMRC) have commenced a collaborative research program in stirred milling technology focusing on mill performance evaluation, model development and scale-up methodology. Industrial VTMs are being assessed using a consistent circuit survey protocol to evaluate the performance of VTMs in comminution circuits. The survey protocol includes identification and modification of sampling points, appropriate sampling techniques, controlled circuit stability, and best sample analysis practice. To initiate this study four surveys were conducted in the tertiary grind circuit in the Ridgeway Concentrator at Cadia Valley Operations (CVO) that treats the full circuit throughput of over 800 tph. To deal with the high feed rate the site opted to lead the world in the application of stirred mills by installing the largest VTM, at 3000 hp (2240kW) in closed circuit with a hydrocyclone bank. On average the operating work index was 13.1 kWh/t, reducing the secondary grind product by 40 - 50 m to the required 80 to 100 m range. The applied specific energy is relatively low in these low-intensity stirred media mills at 2.7 kWh/t. The size specific energy was 24.2 kWh/t-75m. Based on the survey and operating data the VTM circuit is performing well in this high-throughput tertiary grinding application, producing a sub-100m product.CITATION:Palaniandy, S, Powell, M, Hilden, M, Kermanshahi, K, Allen, J and Mwansa, S, 2013. VertiMill - Development of circuit survey and performance evaluation protocols, in Proceedings MetPlant 2013 , pp 162-175 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • VertiMill - Development of Circuit Survey and Performance Evaluation Protocols
    PDF
    This product is exclusive to Digital library subscription
  • VertiMill - Development of Circuit Survey and Performance Evaluation Protocols
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2013
  • PDF Size: 2.726 Mb.
  • Unique ID: P201305017

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.