Conference Proceedings
MetPlant 2017
Conference Proceedings
MetPlant 2017
Critical process design considerations from test work to operations
For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and freezing the process design criteria and flow sheet. This process usually relies upon the experience, skills and personal preferences of various technology providers, study and engineering entities, test work and metallurgical laboratories and, most importantly, the owner's team and its operators. Current industry trends include lower grades, more complex orebodies, geometallurgy in defining orebody variation and design envelopes, more common hybrid plant processes and the market demands for more reliable, timely and predictable early plant performance.This paper will discuss interaction of these trends and provide guidelines for the level of detail and technical complexity required for a number of different typical examples. The paper will pay particular attention to the study definition level translated into the required detail and certainty needed by the overall process owner and original equipment manufacturer (OEM) equipment suppliers to ensure the best real plant performance. Some recent case studies will be discussed. In many projects, at a late stage of project definition, it has become common practice to undertake a value engineering phase. Although it could be argued that this should be undertaken earlier, it is largely driven by an overall need to reduce capex and optimise the perceived fat built into the project during the detailed design process. This value engineering can be very counterproductive to project timing and operational performance and warrants discussion.The paper is intended to promote discussion on a topic of wide interest. The authors' diverse backgrounds and experiences are integral to the views in this paper.CITATION:Dennis, A, Coleman, R and Hunter, T, 2017. Critical process design considerations from test work to operations, in Proceedings MetPlant 2017, pp 12-30 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
A Dennis, R Coleman, T Hunter
-
Critical process design considerations from test work to operationsPDFThis product is exclusive to Digital library subscription
-
Critical process design considerations from test work to operationsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2017
- PDF Size: 0.281 Mb.
- Unique ID: P201706002