Fast-tracking Bald Hill Lithium: Integrated Design-Construct-Operate Strategies

The importance of this study is to challenge accepted best practices for integrated project execution, design, construction, and ongoing plant operation within the mineral processing industry.
An industry where cases of cost, schedule, and ramp-up underperformance are commonplace.
In contrast, case studies of overperformance (i.e. on-budget, fast-tracked project execution followed by ramp-up) offer rare opportunities for industry learning.
The Bald Hill lithium processing plant is a case study exemplifying project outcomes that exceed industry benchmarks for project execution and ramp-up. This paper chronicles the innovative and integrated design, construction, and contractor-operator strategies employed to enable a fast-track schedule from resource definition to full production at the Bald Hill lithium processing plant.
The success of the project is benchmarked on a McNulty curve basis where plant ramp-up is demonstrated to have exceeded even the most rapid McNulty mineral processing plant ramp-up benchmark.
The risk profiles of various project execution strategies are explored to underscore how an integrated design-construct-operate (EPC+O) execution model contributed to a fast-track outcome while striking a more balanced risk distribution between owner and contractor, relative to other traditional execution models such as EPC and EPCM. By using innovative and integrated strategies industry best practice can be reshaped.
The story of the Bald Hill lithium plant presents an opportunity to redefine historical definitions of success.
CITATION:Arvidson, G, Warden, C, Davies, B, Piirto, M and Lopez, B, 2019. Fast-tracking Bald Hill Lithium: Integrated Design-Construct-Operate Strategies, in Proceedings MetPlant 2019, pp 274285 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Fast-tracking Bald Hill Lithium: Integrated Design-Construct-Operate Strategies
    PDF
    This product is exclusive to Digital library subscription
  • Fast-tracking Bald Hill Lithium: Integrated Design-Construct-Operate Strategies
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2019
  • PDF Size: 1.428 Mb.
  • Unique ID: p201905021

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.