Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

MetPlant 2019

Conference Proceedings

MetPlant 2019

PDF Add to cart

Grinding Circuit Design for the Carrapateena Concentrator

The OZ Minerals Carrapateena mine and concentrator is located approximately 160 kilometres north of Port Augusta on the eastern margin of the Gawler Craton in South Australia. Carrapateena is an Iron Oxide Copper Gold deposit (IOCG) and the concentrator is due to meet practical completion in late 2019 after which the site will move into commercial production with an anticipated twenty-year mine life. Construction of the Concentrator commenced in April 2018 and is due to meet practical completion in the 4th quarter of 2019, from which the site will move into commissioning and ramp up. The Carrapateena Concentrator is comprised of a conventional semi-autogenous-ball-mill-crusher (SABC) grinding circuit and flotation plant with 4 Mt/y design throughput capacity being fed from a Sub Level Cave (SLC) mining operation. The concentrator will produce approximately 65 kt/y of copper in concentrate along with gold and silver credits, with a relatively high-grade copper concentrate due to the bornite / chalcopyrite mineralisation in the ore body. Samples selected for the comminution test work undertaken to design the grinding circuit were derived using a geometallurgical material type identification regime.
Process modelling was performed via two different methodologies in order to size the mills for construction. This paper discusses plant design development, including the comminution circuit design, the layout of the grinding area and the process control selection.
CITATION:Weidenbach, M, Baade, B, Sepplet, J, Lane, G and Stephenson, D, 2019. Grinding Circuit Design for the Carrapateena Concentrator, in Proceedings MetPlant 2019, pp 324337 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Grinding Circuit Design for the Carrapateena Concentrator
    PDF
    This product is exclusive to Digital library subscription
  • Grinding Circuit Design for the Carrapateena Concentrator
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2019
  • PDF Size: 1.525 Mb.
  • Unique ID: p201905025

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.