Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

MetPlant 2019

Conference Proceedings

MetPlant 2019

PDF Add to cart

Improved Recovery through Changes in Operating Philosophies at IGO’s Nova Operation

Independence Groups Nova Nickel-Copper-Cobalt operation (Nova) transitioned from commissioning into commercial production in July 2017. The operation is based in the prospective Fraser Range of Western Australia, approximately 130km east of Norseman and produces separate Copper and Nickel sulfide concentrates. As ore throughput and feed grades began approaching the life-of-mine production plan, copper metal recoveries began to diverge from theoretical optimums. A revision of the operating philosophy in a key flotation train was undertaken and an automated reagent dosing system was introduced. The changes implemented as a result of this analysis have underpinned an increase in final copper metal recovery, which is now in line with theoretical recoveries. The modifications to the core control strategy were aimed at limiting the recovery of penalty elements into the cleaning circuit to allow a higher recovery of final concentrate whilst continuing to meet offtake specifications. The reagent dosing strategy was revised to consider the nickel metal feed rate as opposed to feed grade and throughput independently. This permitted the integration of a system that automatically regulates depressant (sodium sulfite) and modifier (TETA) dosage rates. Following the success of this project, similar strategies are being employed in other areas of the processing plant.
This paper discusses the metallurgy of the circuit, the control philosophies employed in a key flotation train, the methodology used for reagent control and the theory behind the optimal dosing setpoints, as well as a comprehensive review of the results and benefits yielded as a result of the implemented changes.
CITATION:Hearne, Z, Gomes-Sebastiao, G, Crow, J and Vines, N, 2019. Improved Recovery through Changes in Operating Philosophies at IGOs Nova Operation, in Proceedings MetPlant 2019, pp 300312 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Improved Recovery through Changes in Operating Philosophies at IGO’s Nova Operation
    PDF
    This product is exclusive to Digital library subscription
  • Improved Recovery through Changes in Operating Philosophies at IGO’s Nova Operation
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2019
  • PDF Size: 1.414 Mb.
  • Unique ID: p201905023

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.