Skip to main content
Conference Proceedings

Mill Operators' Conference, North West Queensland

Conference Proceedings

Mill Operators' Conference, North West Queensland

PDF Add to cart

Counter Current Decantation at Central Norseman Gold Corporation Limited

As the gold price, and consequently ore reserves, improved in the late 1970's, a programme of upgrading the gold recovery circuit at the Phoenix treatment plant at Central Norseman was initiated. The introduction of oxidised ore with a high clay content from the North Royal open cut caused a reduction in thickening and filtering capacities, which in turn restricted plant throughput and increased gold losses in the residue solutions. Test work into alternative washing facilities showed that the installation of a five stage counter current decantation system would restore throughput and reduce soluble gold losses. Installation of the system achieved the objectives of increased plant tonnage, increased proportions of the high grade oxidised ore in the mill feed and decreased gold losses in the residue waters.
Return to parent product
  • Counter Current Decantation at Central Norseman Gold Corporation Limited
    PDF
    This product is exclusive to Digital library subscription
  • Counter Current Decantation at Central Norseman Gold Corporation Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1977
  • PDF Size: 0.133 Mb.
  • Unique ID: P197801017

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.