A sustained drop in the grade of Mount Isa lead-zinc-silver ore occurred in mid 1980._x000D_
It was decided to increase concentrator throughput from 200 000 to 240 000 tonnes/four week period to maintain budget metal production. To achieve this increase whilst maintaining acceptable grinding and flotation performance, crushing plant final product size had to be reduced from 100%-13mm to 1000-11.2mm. The goal in the crushing plant was to achieve a 20% increase in throughput with a 20% decrease in the top size of the product._x000D_
This was achieved by operational changes to improve plant availability and optimisation of the existing crushing and screening equipment Performance.
It was decided to increase concentrator throughput from 200 000 to 240 000 tonnes/four week period to maintain budget metal production. To achieve this increase whilst maintaining acceptable grinding and flotation performance, crushing plant final product size had to be reduced from 100%-13mm to 1000-11.2mm. The goal in the crushing plant was to achieve a 20% increase in throughput with a 20% decrease in the top size of the product._x000D_
This was achieved by operational changes to improve plant availability and optimisation of the existing crushing and screening equipment Performance.
Contributor(s):
M Casey, J Russell
-
Crushing Plant Performance-Mount Isa Lead/Zinc ConcentratorPDFThis product is exclusive to Digital library subscription
-
Crushing Plant Performance-Mount Isa Lead/Zinc ConcentratorPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1978
- PDF Size: 0.276 Mb.
- Unique ID: P197801019