Crushing Plant Performance-Mount Isa Lead/Zinc Concentrator

A sustained drop in the grade of Mount Isa lead-zinc-silver ore occurred in mid 1980._x000D_
It was decided to increase concentrator throughput from 200 000 to 240 000 tonnes/four week period to maintain budget metal production. To achieve this increase whilst maintaining acceptable grinding and flotation performance, crushing plant final product size had to be reduced from 100%-13mm to 1000-11.2mm. The goal in the crushing plant was to achieve a 20% increase in throughput with a 20% decrease in the top size of the product._x000D_
This was achieved by operational changes to improve plant availability and optimisation of the existing crushing and screening equipment Performance.
Return to parent product
  • Crushing Plant Performance-Mount Isa Lead/Zinc Concentrator
    PDF
    This product is exclusive to Digital library subscription
  • Crushing Plant Performance-Mount Isa Lead/Zinc Concentrator
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1977
  • PDF Size: 0.276 Mb.
  • Unique ID: P197801019

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.