Skip to main content
Conference Proceedings

Mill Operators' Conference, North West Queensland

Conference Proceedings

Mill Operators' Conference, North West Queensland

PDF Add to cart

Lead-Zinc Flotation at North Broken Hill Limietd

Present practice of lead-zinc flotation at North Broken Hill Limited is described and factors influencing plant objectives and performance discussed. Mineralogical examination of final flot- ation products showed mineral liberation to be 94T complete and size by size metal recovery tables indicated a need for finer grinding to improve lead and silver recovery, but coarser grinding to improve zinc recovery. A steady grinding circuit, at constant ball mill power and cyclone overflow pulp density, is found desirable for satisfactory flotation circuit operation because instabil- ity in the grinding circuit inevitably leads to flotation instability and as a consequence less than optimal flotation operation. Remov- al of the variable lead flotation middling product from the grinding circuit decreased grinding instability.
Return to parent product
  • Lead-Zinc Flotation at North Broken Hill Limietd
    PDF
    This product is exclusive to Digital library subscription
  • Lead-Zinc Flotation at North Broken Hill Limietd
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1977
  • PDF Size: 0.139 Mb.
  • Unique ID: P197801038

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.