Conference Proceedings
Mill Operators' Conference, North West Queensland
Conference Proceedings
Mill Operators' Conference, North West Queensland
Publication sale now on, get up to 70% off
Lead-Zinc Flotation at North Broken Hill Limietd
Present practice of lead-zinc flotation at North Broken Hill Limited is described and factors influencing plant objectives and performance discussed. Mineralogical examination of final flot- ation products showed mineral liberation to be 94T complete and size by size metal recovery tables indicated a need for finer grinding to improve lead and silver recovery, but coarser grinding to improve zinc recovery. A steady grinding circuit, at constant ball mill power and cyclone overflow pulp density, is found desirable for satisfactory flotation circuit operation because instabil- ity in the grinding circuit inevitably leads to flotation instability and as a consequence less than optimal flotation operation. Remov- al of the variable lead flotation middling product from the grinding circuit decreased grinding instability.
Contributor(s):
T E Slattery, J Burgess
-
Lead-Zinc Flotation at North Broken Hill LimietdPDFThis product is exclusive to Digital library subscription
-
Lead-Zinc Flotation at North Broken Hill LimietdPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1978
- PDF Size: 0.139 Mb.
- Unique ID: P197801038