Skip to main content
Conference Proceedings

MINDEV 97 - The Third International Conference on Mine Project Development

Conference Proceedings

MINDEV 97 - The Third International Conference on Mine Project Development

PDF Add to cart

Kelian Case Study

The Kelian Gold mine project won two excellence awards from the Victorian Division of the Institution of Engineers, Australia. It was a challenging project, fast tracked in a remote and inhospitable tropical environment. The creation of a profitable and efficient mine was a significant engineering and project management achievement. The difficulties encountered and the way they were managed provide valuable lessons. These include the importance of sufficiently detailed engineering in all aspects of the job to enable the best estimates possible to be prepared during feasibility studies, the need to prepare the project scope and execution plan with disciplined and rigorous attention to detail by a highly experienced team and the value of identifying, assessing and mitigating risk and uncertainty during execution. The practical benefits of applying these lessons were demonstrated in the successful management of technical uncertainty on the recent diversion of the Kelian River to allow the expansion of the Kelian mine.
Return to parent product
  • Kelian Case Study
    PDF
    This product is exclusive to Digital library subscription
  • Kelian Case Study
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1997
  • PDF Size: 0.499 Mb.
  • Unique ID: P199707013

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.