Cemented Hydraulic Fill Mix Design As it Applies To Mine Scheduling
The need to schedule ore production to make maximum use of the strength gained by cem- ented fill during curing is discussed, to show how cement content and hence fill cost can be kept down for any particular operation. Results from laboratory testwork on Isa Mine fill conducted by the author while employed by Mount Isa Mines Limited form the basis of the Discussion
Contributor(s):
E G Thomas
-