Conference Proceedings
Mine Filling, North West Queensland
Conference Proceedings
Mine Filling, North West Queensland
The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine Australia
This paper examines the various stages of development and design work which were necessary to develop the cemented rock fill system for copper mining at Mount Isa. The reason for a cemented sand fill development program together with details of the test work undertaken are briefly outlined._x000D_
The testwork associated with the selection of a suitable local rock to supple- ment the cemented hydraulic fill is discussed, as is the method for underground placement and mixing of the graded rock with the cemented hydraulic fill. The design features of the final system which incorporates a graded rock handling system and a cemented hydraulic fill reticula- tion system is outlined.
The testwork associated with the selection of a suitable local rock to supple- ment the cemented hydraulic fill is discussed, as is the method for underground placement and mixing of the graded rock with the cemented hydraulic fill. The design features of the final system which incorporates a graded rock handling system and a cemented hydraulic fill reticula- tion system is outlined.
Contributor(s):
K E Mathews, F E Kaesehagen
-
The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine AustraliaPDFThis product is exclusive to Digital library subscription
-
The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine AustraliaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1973
- PDF Size: 0.775 Mb.
- Unique ID: P197302022