Conference Proceedings
Mine Geologists' Conference, Mount Isa, October 1990
Conference Proceedings
Mine Geologists' Conference, Mount Isa, October 1990
Rosebery - Ore reserve Estimation, Past and Present
The Rosebery Mine on the west coast of Tasmania is a world class polymetallic base metal deposit, containing six major minerals: galena, sphalerite, chalcopyrite, gold, silver and pyrite. This resource has been exploited for nearly a century, yet a reliable estimate of the reserve continues to present a challenge._x000D_
Over the past twenty years, the operation has changed from relatively low productivity cut and fill timber-support scraper mining, to higher productivity bulk mechanised open stoping. At the same time, economic constraints have changed and grades have fallen, which have increased the pressure to refine the resource/reserve estimating processes. This paper compares the restrictions of the polygonal section method of the past with the advantages of a kriged block model. The limitations of Mine Call Factors, the problems involved in converting decades of diamond drilling data on paper into a computer data base, and the effect of this new methodology at Rosebery, are described.
Over the past twenty years, the operation has changed from relatively low productivity cut and fill timber-support scraper mining, to higher productivity bulk mechanised open stoping. At the same time, economic constraints have changed and grades have fallen, which have increased the pressure to refine the resource/reserve estimating processes. This paper compares the restrictions of the polygonal section method of the past with the advantages of a kriged block model. The limitations of Mine Call Factors, the problems involved in converting decades of diamond drilling data on paper into a computer data base, and the effect of this new methodology at Rosebery, are described.
Contributor(s):
J W Farquhar
-
Rosebery - Ore reserve Estimation, Past and PresentPDFThis product is exclusive to Digital library subscription
-
Rosebery - Ore reserve Estimation, Past and PresentPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1990
- PDF Size: 0.958 Mb.
- Unique ID: P199007019