Skip to main content
Conference Proceedings

Mine Planning and Equipment Selection (MPES) 2010

Conference Proceedings

Mine Planning and Equipment Selection (MPES) 2010

PDF Add to cart

A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests

This study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days. Based on the results of the laboratory pull-out test, the pull-out load of two support members rapidly increased with displacement until the breakpoint and then gently increased with displacement. The maximum pull-out load of spiral bolt was larger than that of rebar bolt. This implies that a spiral bolt is more stable than a rebar bolt for securing the stability of a ground or rock mass when a support was installed in a ground or rock mass under the same condition. In addition, the maximum external pressure of two support members increased with pull-out load and with displacement and the distribution of external pressure was commonly larger at the upper part than at the lower part of specimen. This indicates that the bond failure location by pull-out load should be mainly occurred at the surface portion of specimen. In conclusion, the reinforcing effect of a support depends on a curing period and a type of support member, and reinforcement of a spiral bolt is more effective than that of a rebar bolt._x000D_
FORMAL CITATION:Kang, S S, Je, D K, Hirata, A and Kim, D, 2010. A comparison of rebar and spiral bolts using laboratory pull-out tests, in Proceedings Mine Planning and Equipment Selection (MPES) 2010, pp 591-598 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests
    PDF
    This product is exclusive to Digital library subscription
  • A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2010
  • PDF Size: 1.815 Mb.
  • Unique ID: P201011059

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.