An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The globally optimal solution however, can be achieved when integrating scheduling phases and accounting for the interaction between short-term and long-term activities simultaneously. This paper addresses the task of integrating short- and long-term production plans by combining the short-term objective of minimising deviation to targeted mill feed grade with the long-term objective of maximising net present value (NPV) into a single mathematical model. A case study is presented which compares the present values of the same stope data set scheduled via separate long and short-term models and than by the proposed integrated model which applies a predetermined penalty for each tonne of metal deviation to target for the respective ore tonnage being processed. This allows an operation to obtain a globally optimal scheduling regime when taking into consideration the cost and loss of value resulting from fluctuations in grade to the mill over the short-term._x000D_
FORMAL CITATION:Nehring, M, Topal, E, Kizil, M and Knights, P, 2010. An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling, in Proceedings Mine Planning and Equipment Selection (MPES) 2010, pp 141-154 (The Australasian Institute of Mining and Metallurgy: Melbourne).
FORMAL CITATION:Nehring, M, Topal, E, Kizil, M and Knights, P, 2010. An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling, in Proceedings Mine Planning and Equipment Selection (MPES) 2010, pp 141-154 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
M Nehring, E Topal, M Kizil, P Knights
-
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production SchedulingPDFThis product is exclusive to Digital library subscription
-
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production SchedulingPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2010
- PDF Size: 0.209 Mb.
- Unique ID: P201011017