Conference Proceedings
Mine Planning and Equipment Selection (MPES) 2010
Conference Proceedings
Mine Planning and Equipment Selection (MPES) 2010
Ranking of Belt Conveyor Systems for Prefeasibility Study
Prefeasibility planning and cost estimation of conveyor systems has historically been undertaken by comparing fi xed plant transport requirements to that of similar systems in service. This paper describes the development of a prefeasibility conveyor technical design and cost estimation application using Microsoft Excel Visual Basic for Applications (VBA) platform. The application tool known as D-Convey (Dachshund Convey) was developed with the goal enabling the end user: to develop a technical model for conceptualised conveyor systems, to perform economic analysis on the developed technical model, and to conduct a comparative and risk analysis._x000D_
An Excel VBA based platform was utilised to draw upon both the analytical and graphical capabilities of a spreadsheet. Some of the features of D-Convey system include a revolutionary dynamic graphical help system, known as the information pane' in lieu of traditional help fi les as well as the use of familiar graphical user interface elements such as the MS Offi ce 2007 task ribbon. The D-Convey system incorporates material database allowing for mass handling prefeasibility estimation in other industries; it has been validated at a local quarry._x000D_
FORMAL CITATION:Baafi, E Y and Bedward, D A, 2010. Ranking of belt conveyor systems for prefeasibility study, in Proceedings Mine Planning and Equipment Selection (MPES) 2010, pp 373-378 (The Australasian Institute of Mining and Metallurgy: Melbourne).
An Excel VBA based platform was utilised to draw upon both the analytical and graphical capabilities of a spreadsheet. Some of the features of D-Convey system include a revolutionary dynamic graphical help system, known as the information pane' in lieu of traditional help fi les as well as the use of familiar graphical user interface elements such as the MS Offi ce 2007 task ribbon. The D-Convey system incorporates material database allowing for mass handling prefeasibility estimation in other industries; it has been validated at a local quarry._x000D_
FORMAL CITATION:Baafi, E Y and Bedward, D A, 2010. Ranking of belt conveyor systems for prefeasibility study, in Proceedings Mine Planning and Equipment Selection (MPES) 2010, pp 373-378 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
E Y Baafi, D A Bedward
-
Ranking of Belt Conveyor Systems for Prefeasibility StudyPDFThis product is exclusive to Digital library subscription
-
Ranking of Belt Conveyor Systems for Prefeasibility StudyPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2010
- PDF Size: 0.387 Mb.
- Unique ID: P201011039