Skip to main content
Conference Proceedings

Mine Planning and Equipment Selection (MPES) 2010

Conference Proceedings

Mine Planning and Equipment Selection (MPES) 2010

PDF Add to cart

Ultimate Pit Limit of Iron Ore Mines using Maximum Flow Algorithms

A major problem in open pit mine planning is to determine the optimum pit limit of the mine. The optimum pit limit is the one with maximum discounted net profit and satisfies technical conditions. A number of optimisation techniques have been proposed for determination of pit limits. Among these techniques, those based on graph theory are suitable to solve the three-dimensional (3D) problem. In this paper, two maximum flow methods named, Dinic's algorithm and Push-Relabel algorithm have been used to find the optimum pit limit of an iron ore mine. This method has been implemented in Gol-e-Gohar iron mine in south east of Iran in order to find the final pit limit. Issues, like properties of the mine and orebody, are studied. These properties include wall slope, sulfur and phosphor grade restrictions. The result shows that these properties have significant effect on the determined pit limit._x000D_
FORMAL CITATION:Osanloo, M, Rahmanpour, M and Sadri, A, 2010._x000D_
Ultimate pit limit of iron ore mines using maximum flow algorithms, in Proceedings Mine Planning and Equipment Selection (MPES) 2010, pp 81-88 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Ultimate Pit Limit of Iron Ore Mines using Maximum Flow Algorithms
    PDF
    This product is exclusive to Digital library subscription
  • Ultimate Pit Limit of Iron Ore Mines using Maximum Flow Algorithms
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2010
  • PDF Size: 0.279 Mb.
  • Unique ID: P201011011

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.