Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

Mine Waste and Tailings Conference 2021

Conference Proceedings

Mine Waste and Tailings Conference 2021

PDF Add to cart

Technology integration for tailings storage facility construction

The safe life cycle of a Tailings Storage Facility (TSF) is founded on the fundamentals of proper design, construction, operation and closure. Leinster Nickel Operations (Leinster) utilises four active TSF cells that are cycled between filling (deposition), desiccation, and construction to meet a targeted rate of rise. This results in ongoing and consistent raising of the TSF walls. Critical to maintaining the safe life cycle through this consistent wall raising is precision construction and high frequency quality assurance to ensure compliance to design requirements and TSF walls free from defects.
Leinster has recently deployed Intelligent Machine Control technology for TSF construction. Advances in Intelligent Machine Control have decreased variability in construction; ensuring variations are within the tolerances of design. The Intelligent Machine Controls are programed to ensure construction conforms to design tolerances of +/-30mm. This level of accuracy provides assurance of borrow area set out, compacted layers are as per design, compaction monitoring is within the zone placed, scarification between layers to prevent lamination is maintained, and batter angles are set to the correct grade. This level of control provides certainty that construction meets the design intent.
In conjunction with Intelligent Machine Control, periodic drone surveys are conducted to verify construction against design. Advancement in survey equipment and techniques allow higher frequency, high accuracy survey to be completed on demand by site based personnel. This provides quality assurance through all stages of the construction phases, as well as the final constructed wall, ensuring compliance to design.
Combining Intelligent Machine Control with higher frequency quality assurance provides an increased level of certainty that the TSF construction is defect free and within quality specifications. These recent technological advancements in Construction and Quality Assurance ensure cell raises are constructed to the design intent with greater levels of accuracy and precision than ever before.
Return to parent product
  • Technology integration for tailings storage facility construction
    PDF
    This product is exclusive to Digital library subscription
  • Technology integration for tailings storage facility construction
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2021
  • Pages: 9
  • PDF Size: 3.176 Mb.
  • Unique ID: P-01779-V4N5K1

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.