Pillar Extraction at the Doe Run Company, 1991-1998
The Doc Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaining pillars._x000D_
The original design and planning for the mines did not include extensive pillar extraction. This paper summarises the introduction of the pillar extraction and backfill techniques which have been implemented since 1991. These techniques include the use of low cost fill walls up to 20 in in height and the use of stinger trucks for topping off the fill. In conjunction with these accomplishments, much experience and confidence has been gained in the use of numerical modelling as a method of predicting pillar stability as the mining of pillars progresses. These advances have led to pillar extraction hecoming a major portion of the overall production and have added to the mine life of Doe Run's six operating mines.
The original design and planning for the mines did not include extensive pillar extraction. This paper summarises the introduction of the pillar extraction and backfill techniques which have been implemented since 1991. These techniques include the use of low cost fill walls up to 20 in in height and the use of stinger trucks for topping off the fill. In conjunction with these accomplishments, much experience and confidence has been gained in the use of numerical modelling as a method of predicting pillar stability as the mining of pillars progresses. These advances have led to pillar extraction hecoming a major portion of the overall production and have added to the mine life of Doe Run's six operating mines.
Contributor(s):
D P Roberts, W L Lane, T R Yanske
-
Pillar Extraction at the Doe Run Company, 1991-1998PDFThis product is exclusive to Digital library subscription
-
Pillar Extraction at the Doe Run Company, 1991-1998PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1998
- PDF Size: 0.639 Mb.
- Unique ID: P199801037