Conference Proceedings
MINEFILL '98 - The Sixth International Symposium on Mining with Backfill, Brisbane, Qld, April
Conference Proceedings
MINEFILL '98 - The Sixth International Symposium on Mining with Backfill, Brisbane, Qld, April
The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa
Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the deepest underground mine in Australia with its lowest mining horizon at nearly 1.6 km below surface. The following fill requirements were defined for the 3500 Orebody during the feasibility study: 1. a minimum filling rate of 250 ma/h, 2. a curing time of 28 days, and 3. minimum free fill water. This paper mainly describes the investigation of high density and paste fills for the 3500 Orebody. The investigation covered all the key issues relating to fill option selection, including design criteria, material supply and demand assessment, drainage modelling, tailing dewatering method, mix design and a pump loop test. Results of the investigation indicate that both high density fill and paste fill are technically feasible. The investigation has led to the selection of a blended tailing paste for the 3500 Orebody as the paste option has significant advantages over high density fill in stope filling rates and fill reticulation. The blended tailing for paste fill is finer than Isa deslimed tailing but coarser than full plant tailing. The paste fill selected has minimum binder and tailing dewatering requirements while a relatively high filling rate is achieved.
Contributor(s):
J J Z Chen, Y Potvin, K Kuganathan
-
The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount IsaPDFThis product is exclusive to Digital library subscription
-
The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount IsaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1998
- PDF Size: 0.055 Mb.
- Unique ID: P199801047