Skip to main content
Conference Proceedings

Mining Geology 2014

Conference Proceedings

Mining Geology 2014

PDF Add to cart

Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo

The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource was initially estimated by uniform conditioning (UC) and subsequently updated to localised uniform conditioning (LUC). This paper discusses the implementation of an estimate run using LUC and compares the results based on resource definition drilling to those obtained by close spaced grade control drilling and actual mill production.UC is a nonlinear geostatistical technique designed for recoverable resource estimation, typically using wide spaced exploration and resource definition drilling. The primary output of UC is the grade, tonnage and metal above a series of user-defined cut-off grades for a particular selective mining unit (SMU) block size. The UC approach is considered to provide a more accurate representation of the recoverable grade and tonnage at SMU support for non-zero grade cut-offs than would typically be achieved by a traditional linear estimator such as Ordinary Kriging. LUC is a relatively new approach involving the post-processing of a UC estimate and is used to spatially present the grade distribution predicted by UC at the SMU scale.This study demonstrates that the calculation of a more accurate and realistic grade-tonnage relationship for small SMU sized blocks is possible at the exploration stage using LUC, provided that the necessary theoretical and practical conditions for implementation of this technique exist.CITATION:Millad, M G and Zammit, M, 2014. Implementation of localised uniform conditioning for recoverable resource estimation at the Kipoi Copper Project, Democratic Republic of the Congo, in Proceedings Ninth International Mining Geology Conference 2014 , pp 207-214 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo
    PDF
    This product is exclusive to Digital library subscription
  • Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2013
  • PDF Size: 8.268 Mb.
  • Unique ID: P201407026

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.