Conference Proceedings
Mining Geology 2014
Conference Proceedings
Mining Geology 2014
Remodelling the Purnama Deposit - An Interpretation Case Study from G-Resources Martabe Project, Indonesia
The high sulfidation Purnama Au-Ag deposit located on the Indonesian island of Sumatra entered production in mid-2012 following a two-year program of construction and development. Discovered in 1997 following a regional stream sediment geochemical sampling program by the Normandy Anglo Asia joint venture, it is the first and largest deposit in G-Resource's Martabe Project to enter production and is the centrepiece of a series of six deposits totalling 8.1 Moz Au and 73.8 Moz Ag in Mineral Resources (G-Resources, 2013a).In 2011 investigation into the controls of high-grade mineralisation in isolated parts of the deposit identified a potentially significant mineralisation style which had not been previously recognised or accommodated in the resource model. An extensive investigation of core and logging data followed to confirm the distribution of the somewhat unusual mineralisation style - a sedimentary-like cavity infill of very high-grade auriferous pyrite within the steep hydrothermal breccia feeders to the system. With the bulk of mineralisation located within the adjacent volcanic sequence and sandy-matrix phreatomagmatic breccia surrounding the feeders, the lack of constraint for high-grade intersections in the hydrothermal breccia zones had potential to significantly impact the mine plan in the lower sections of the planned pit through overestimation of local gold grade. Combined with new data emerging from grade control drilling and infill resource drilling in the pit, a program of reinterpretation of the deposit was initiated to update the geological and alteration framework underpinning the resource model. The result has improved the economics of the project and added metal to the Ore Reserve for Purnama.CITATION:Sims, D, Henim, L, Hertrijana, J, Kusnanto, A N and Crispin, S, 2014. Remodelling the Purnama deposit - an interpretation case study from G-Resources Martabe Project, Indonesia, in Proceedings Ninth International Mining Geology Conference 2014 , pp 229-236 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
D Sims, L Henim, J Hertrijana, A N Kusnanto, S Crispin
-
Remodelling the Purnama Deposit - An Interpretation Case Study from G-Resources Martabe Project, IndonesiaPDFThis product is exclusive to Digital library subscription
-
Remodelling the Purnama Deposit - An Interpretation Case Study from G-Resources Martabe Project, IndonesiaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2013
- PDF Size: 8.59 Mb.
- Unique ID: P201407029