Kalgoorlie Tailings Retreatment Project- A Case Study

The Kalgoorlie Tailings Retreatment Project (or "Kaltails") involves the reclamation and retreatment of approximately 50 million tonnes of gold tailing situated on the Golden Mile at Kalgoorlie, Western Australia._x000D_
Tailing is reclaimed and retreated at the rate of 42 million tonnes per annum. The project is a Joint Venture between Poseidon Limited and Gold Corporation, with Poseidon being the major participant (90%) and manager of the operation through its wholly owned subsidiary Kaltails Mining Services Pty Ltd. The marginal nature of the tailing retreatment project dictated that a detailed feasibility study be undertaken. Extensive sampling and metallurgical testing of the tailing permitted the development of an optimum economic processing route. A sensitivity analysis undertaken as part of the feasibility study indicated the project to be very sensitive to gold price and unit operating cost variations, and relatively insensitive to capital cost variations.
Return to parent product
  • Kalgoorlie Tailings Retreatment Project- A Case Study
    PDF
    This product is exclusive to Digital library subscription
  • Kalgoorlie Tailings Retreatment Project- A Case Study
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1990
  • PDF Size: 3.703 Mb.
  • Unique ID: P199004016

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.