Skip to main content
Conference Proceedings

Narrow Vein Mining Conference 2008

Conference Proceedings

Narrow Vein Mining Conference 2008

PDF Add to cart

Drift and Fill - The High Value, High Recovery Mining System

At times of high metal prices, mining projects that have previously been put into the too hard basket' are now being more closely examined. Typically these projects include the potential recovery of small mineable tonnes with high contained metal values and often with poor ground conditions._x000D_
For many underground mining projects, the drift and fill method is viewed as a high-cost method and a method of last resort'. As a result the method is not well known in Australia and it is the authors' view that the method is under utilised._x000D_
The drift and fill method can be applied to a variety of underground mining situations and is a preferred method for some orebody geometries and where ore recovery is viewed as a key to project success. This paper examines some of the critical mine planning and backfill issues involved with the drift and fill mining method.
Return to parent product
  • Drift and Fill - The High Value, High Recovery Mining System
    PDF
    This product is exclusive to Digital library subscription
  • Drift and Fill - The High Value, High Recovery Mining System
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2008
  • PDF Size: 0.86 Mb.
  • Unique ID: P200809021

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.