Skip to main content
Conference Proceedings

Narrow Vein Mining Conference 2008

Conference Proceedings

Narrow Vein Mining Conference 2008

PDF Add to cart

Historical Challenges, Modern Solutions at Ballarat East

Gold was initially discovered at Ballarat in 1851. After initial alluvial mining, underground quartz mining commenced in 1853, continuing until 1918. The historic miners were considered to be capable of mining anywhere in the world after overcoming the difficult conditions within the Ballarat goldfields. Whilst mining has changed dramatically since the early 1900s the challenges with underground mining at Ballarat have not. Modern pumping systems cope with the moderate water inflows. However, modern machinery and efficient mining methods influence opening sizes and extraction techniques. In some cases modern techniques have accentuated the challenging ground conditions and complex orebodies that were faced by the historic miners. As the Ballarat East project has progressed towards production, technical challenges relating to geomechanics and mine planning are being resolved resourcefully.
Return to parent product
  • Historical Challenges, Modern Solutions at Ballarat East
    PDF
    This product is exclusive to Digital library subscription
  • Historical Challenges, Modern Solutions at Ballarat East
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2008
  • PDF Size: 3.277 Mb.
  • Unique ID: P200809026

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.