Skip to main content
Conference Proceedings

Narrow Vein Mining Conference 2008

Conference Proceedings

Narrow Vein Mining Conference 2008

PDF Add to cart

Tarnagulla Gold Mine

The Tarnagulla Gold Project in Central Victoria, Australia, was developed and operated by Reef Mining NL between 1994 and early 2000, producing 53 000 ounces of gold from the Nick O'Time Shoot, a single narrow vein shoot structure within part of the larger Poverty Reef, with a strike length ranging from 30 m to 60 m._x000D_
The ore shoot was developed over a vertical interval of 190 m, using a small cross-section decline and small, mechanised equipment. Various stoping methods were employed including mechanised cut-and-fill with a single boom jumbo, hand-held mining using airleg drills and rope scrapers, and small uphole retreat stopes using a line of sight remote operated LHD to recover a crown pillar._x000D_
Experience during stoping showed that airleg drilling and rope scrapers gave much better dilution control than diesel equipment. Innovations included a low-cost hydraulic fill system._x000D_
Due to the small scale of the deposit, the feasibility studies, planning and permitting for the mine were based on very limited drilling information; however, the mine was brought into production within two years of the discovery._x000D_
While the mine made an operating profit, it failed to fully repay capital at the low gold price then prevailing. Applying the lessons learned from the operation to optimise the access and stoping method, the project is re-examined at today's gold price and operating costs. Central Victoria has the potential to host many similar small deposits._x000D_
The authors were respectively Non-Executive Director and Resident Manager for Reef Mining NL when the mine was operating.
Return to parent product
  • Tarnagulla Gold Mine
    PDF
    This product is exclusive to Digital library subscription
  • Tarnagulla Gold Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2008
  • PDF Size: 5.252 Mb.
  • Unique ID: P200809027

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.