Skip to main content
Conference Proceedings

Narrow Vein Mining Conference 2012

Conference Proceedings

Narrow Vein Mining Conference 2012

PDF Add to cart

Pillar Recovery at Cracow Gold Mine using Grouted Consolidated Mullock

This paper describes the method of extracting sill pillars within the underground operation from under unconsolidated mullock fill at the Cracow Gold Mine. This pillar recovery method was initially successfully used to recover sill pillars at Crusader Mine, Western Australia in 2001. Globally significant resources have been sterilised due to the placement of loose rock fill above crown pillars and within adjacent stopes. The method described here offers significant opportunities to increase recovery of sill pillar recoveries.The royal orebody sill pillars at Cracow Gold Mine form a significant resource. Extraction of these pillars needed to be undertaken with minimal ore dilution and maximum ore recovery. The application that was selected to consolidate the loose mullock fill above each pillar used an injection grouting process (Minova FB200).Cracow Gold Mine mining method is bottom up bench mining. The pillars were left within the orebody to allow for stoping to commence whilst the decline was being developed. Due to the remainder of the orebody being extracted the only access to consolidate the backfill was from the sill pillar extraction level. Numerous problems were encountered and overcome from product selection and trial, system of injection to extraction.This pillar recovery process achieved a 95 per cent recovery of the sill pillar compared with an estimated 60 per cent typical for other mining options.CITATION:Potts, L, Mutton, V and Joyce, D, 2012. Pillar recovery at Cracow gold mine using grouted consolidated mullock, in Proceedings Narrow Vein Mining 2012 , pp 179-184 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Pillar Recovery at Cracow Gold Mine using Grouted Consolidated Mullock
    PDF
    This product is exclusive to Digital library subscription
  • Pillar Recovery at Cracow Gold Mine using Grouted Consolidated Mullock
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2012
  • PDF Size: 0.573 Mb.
  • Unique ID: P201202019

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.