Rise and Pillar Rill Stoping at Golden Crown Mine
Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 150 LHD units.
Previously the standard development method consisted of developing a sill drive, a footwall drive and millholes every 7 m. This meant that for every metre of ore development, 2 m of waste development was required.
Previously the standard development method consisted of developing a sill drive, a footwall drive and millholes every 7 m. This meant that for every metre of ore development, 2 m of waste development was required.
Contributor(s):
P Beilby, M Rogers, B Sullivan
-
Rise and Pillar Rill Stoping at Golden Crown MinePDFThis product is exclusive to Digital library subscription
-
Rise and Pillar Rill Stoping at Golden Crown MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1993
- PDF Size: 0.369 Mb.
- Unique ID: P199304012