Liner Optimisation to Improve Availability of the Ridgeway SAG Mill
Mill relining is a major contributor to overall plant downtime. Reducing the number of mill liner pieces removed from and replaced in the mill has a direct impact on the overall reline time and in turn, mill availability. To improve the mill availability of Ridgeway Operations' 32 foot SAG mill, a number of initiatives were implemented in terms of liner design. These included the conversion of the shell from 40 to 30 rows, reducing the number of pieces from 80 to 60 each shell reline and reducing the number of pieces from 48 to 32 per feed end reline._x000D_
In addition, modifications were made to the discharge end of the mill to extend the life of the outer pulp lifter and discharge cone, thereby reducing the frequency of change out. The standard radial outer pulp lifter was converted to an angled design. The discharge cone was converted to the BullnoseTM design supplied by Bradken._x000D_
This paper discusses the design changes made and the expected benefits to the Ridgeway Operations in terms of mill availability improvements.
In addition, modifications were made to the discharge end of the mill to extend the life of the outer pulp lifter and discharge cone, thereby reducing the frequency of change out. The standard radial outer pulp lifter was converted to an angled design. The discharge cone was converted to the BullnoseTM design supplied by Bradken._x000D_
This paper discusses the design changes made and the expected benefits to the Ridgeway Operations in terms of mill availability improvements.
Contributor(s):
M Weidenbach, P Griffin
-
Liner Optimisation to Improve Availability of the Ridgeway SAG MillPDFThis product is exclusive to Digital library subscription
-
Liner Optimisation to Improve Availability of the Ridgeway SAG MillPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2007
- PDF Size: 1.615 Mb.
- Unique ID: P200701017