Skip to main content
Conference Proceedings

9th Mill Operators' Conference

Conference Proceedings

9th Mill Operators' Conference

PDF Add to cart

Optimisation of Flotation Circuit Configuration at PT Newmont Nusa Tenggara

Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recovery during high mill throughput and high feed grade periods. Installation of the columns has allowed the relatively coarse, well-liberated rougher concentrate and the relatively fine, low-grade scavenger concentrate to be treated separately, improving metallurgical performance in the cleaner circuit. Plant results show that the columns produce a high-grade concentrate at an average stage copper recovery of approximately 80 per cent. There is also indication of increases in both overall plant copper recovery and final concentrate copper grade. In addition, the operability and stability of the cleaner circuit has greatly improved.
Return to parent product
  • Optimisation of Flotation Circuit Configuration at PT Newmont Nusa Tenggara
    PDF
    This product is exclusive to Digital library subscription
  • Optimisation of Flotation Circuit Configuration at PT Newmont Nusa Tenggara
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2006
  • PDF Size: 0.245 Mb.
  • Unique ID: P200701012

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.