Skip to main content
Conference Proceedings

9th Mill Operators' Conference

Conference Proceedings

9th Mill Operators' Conference

PDF Add to cart

Process Design of a Regrind Facility at the Leinster Nickel Operations to Improve Concentrator Recovery

This paper presents the development of a regrind facility design at BHP Billiton's Leinster Nickel Operations (LNO) in Western Australia. The recovery opportunity was identified from an analysis of plant operating data together with scanning electron microscope (SEM) measurements on relevant tailings streams from LNO. A laboratory procedure was developed to determine the potential recovery improvement of installing a regrind facility at LNO. The last step in formulating the process flow sheet and defining the process design criteria was to construct and operate a pilot plant, which incorporated four banks of flotation cells and an Xstrata M20 Isa Mill. Pilot plant on/off trials were used to define the expected metallurgical benefit. A prefeasibility engineering design and cost estimate was completed. Following a successful internal business evaluation, a feasibility study is currently underway.
Return to parent product
  • Process Design of a Regrind Facility at the Leinster Nickel Operations to Improve Concentrator Recovery
    PDF
    This product is exclusive to Digital library subscription
  • Process Design of a Regrind Facility at the Leinster Nickel Operations to Improve Concentrator Recovery
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2006
  • PDF Size: 0.526 Mb.
  • Unique ID: P200701018

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.