In 2001, the Springvale Coal Mine determined a requirement for a 360 m deep vertical airway to ventilate ongoing underground longwall mining operations. The project, referred to as the Springvale No 3 Ventilation Shaft, was completed in 2003 - 2004 by blind boring a 4.25 m diameter hole from the surface to the coal seam at 360 m depth. The shaft was completed with a 3.5 m inside diameter lining made from a continuous watertight steel and concrete composite pipe. Presented from both the client's and the contractor's perspective, the following paper describes the process of constructing a blind bored ventilation shaft for this application. Beginning with the client's definition of the requirements and specifications for the shaft, the paper describes the steps followed by Springvale Coal prior to awarding the contract. Springv ale's process involved a thorough site investigation including procurement of geotechnical data for prospective contractors and the management of issues relating to safety, quality and the environment. The client's view is followed by a description of the planning and works performed by their nominated shaft drilling contractor, Ardent Underground Pty Ltd.The contractor's description of the works includes the details of the blind shaft drilling and lining construction process used for this application. The design of the shaft lining installed at Springvale Coal was the first of its type to be used in Australia. The successful installation of a watertight composite shaft lining and the safety of the method, which did not require any personnel to enter the shaft or the mine, were among the positive outcomes from the project._x000D_
FORMAL CITATION:O'Brien, R and Zeni, J, 2005. From inception to completion - a blind bored ventilation shaft and watertight lining for the Springvale Coal Mine, in Proceedings Ninth Underground Operators' Conference 2005, pp 21-28 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • From Inception to Completion - A Blind Bored Ventilation Shaft and Watertight Lining for the Springvale Coal Mine
    PDF
    This product is exclusive to Digital library subscription
  • From Inception to Completion - A Blind Bored Ventilation Shaft and Watertight Lining for the Springvale Coal Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2005
  • PDF Size: 1.912 Mb.
  • Unique ID: P200501003

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.