Skip to main content
Conference Proceedings

Ninth Underground Operators' Conference 2005

Conference Proceedings

Ninth Underground Operators' Conference 2005

PDF Add to cart

Optimising Raising Development Using the Drop Raise Method at DOZ Mine PT Freeport Indonesia

The DOZ underground mine at PT Freeport Indonesia is a copper and gold mine in Indonesia with current ore production of 42 000 tpd. Because of the mine expansion into the West DOZ more ventilation raises are needed to create a safe and healthy work place. All ventilation raises that connect the extraction levels to the underlying gallery exhaust drifts at DOZ are now developed using drop raise techniques._x000D_
This paper describes the improvements undertaken to increase blasting efficiency, to decrease cost and reduce safety risks. This was achieved by using deck loading and presplitting, changing of stemming materials and prevention of excessive raise collar cratering (blow up)._x000D_
FORMAL CITATION:Siswanto, H and Rakidjan, M E, 2005. Optimising raising development using the drop raise method at DOZ Mine PT Freeport Indonesia, in Proceedings Ninth Underground Operators' Conference 2005, pp 289-292 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Optimising Raising Development Using the Drop Raise Method at DOZ Mine PT Freeport Indonesia
    PDF
    This product is exclusive to Digital library subscription
  • Optimising Raising Development Using the Drop Raise Method at DOZ Mine PT Freeport Indonesia
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2005
  • PDF Size: 0.86 Mb.
  • Unique ID: P200501032

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.