Conference Proceedings
Non-ferrous Smelting Symposium: 100 Years of Smelting and Refining Operations in Port Pirie, SA September 1989
Conference Proceedings
Non-ferrous Smelting Symposium: 100 Years of Smelting and Refining Operations in Port Pirie, SA September 1989
Simulation of Copper Heap Leaching as an Aid to Design and Operation
Results are reported for the computer simulation of heap leaching of mixed copper oxide and sulphide ores. They resemble those obtained from testwork in terms of a substantial peak in the copper concentration of the pregnant solution, an initial period when no copper emerges and a lengthy period towards the end when the copper concentration and the daily increment in copper recovery are low. The simulation can be used to forecast process results before any column or similar testwork is performed. Potential applications of the simulation to process design, operating strategy and optimisation are discussed._x000D_
Three modes of operation are identified that correspond to different performance patterns and dependencies on ore and process variables. The relative merits of different operating strategies for approaching the ideal performance are being investigated. For process design and development purposes, the simulation may be used with a limited testwork programme to achieve significant savings in time and resources.
Three modes of operation are identified that correspond to different performance patterns and dependencies on ore and process variables. The relative merits of different operating strategies for approaching the ideal performance are being investigated. For process design and development purposes, the simulation may be used with a limited testwork programme to achieve significant savings in time and resources.
Contributor(s):
A P Prosser, A N Mansor
-
Simulation of Copper Heap Leaching as an Aid to Design and OperationPDFThis product is exclusive to Digital library subscription
-
Simulation of Copper Heap Leaching as an Aid to Design and OperationPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1989
- PDF Size: 0.547 Mb.
- Unique ID: P198906026