Conference Proceedings
Non-ferrous Smelting Symposium: 100 Years of Smelting and Refining Operations in Port Pirie, SA September 1989
Conference Proceedings
Non-ferrous Smelting Symposium: 100 Years of Smelting and Refining Operations in Port Pirie, SA September 1989
Strong Acid Leaching and Filtration of Lead/Silver Residue
A commercial scale strong acid leaching plant was commissioned at the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, a member of the Pasminco group of companies, in February 1988. It was designed to upgrade the lead/silver residue product from 26% to 37% lead, thus improving the realised value and increasing overall zinc recovery. This in turn enables the lead smelter treating the lead residue to improve its productivity. The equipment consists of two 250m3 bricklined leach tanks and two 6.5m diameter stainless steel high rate thickeners operating with counter current washing at 95C and 120 g/L H2SO4. The present filtration and drying equipment is also being replaced. Two 35m2 squeeze action filter presses equipped with horizontal plates are being installed, together with ancillary drying equipment to ensure that the final product complies with the transportable moisture limit._x000D_
The new filtration plant is due to be commissioned in mid-1989.
The new filtration plant is due to be commissioned in mid-1989.
Contributor(s):
J H Kouw, R W Adams
-
Strong Acid Leaching and Filtration of Lead/Silver ResiduePDFThis product is exclusive to Digital library subscription
-
Strong Acid Leaching and Filtration of Lead/Silver ResiduePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1989
- PDF Size: 0.489 Mb.
- Unique ID: P198906027