Conference Proceedings
NQ Gold 89 Conference, Townsville Qld
Conference Proceedings
NQ Gold 89 Conference, Townsville Qld
Wirralie Gold Mine A Case Study
Within a short time frame of just over two years Wirralie Gold Mine has been developed from a virgin geological discovery to an operating gold mine with a mine life of six years and a production rate of 50,000 oz per annum. Construction work on the 600,000 tpa single stage crushing, two stage milling CIP plant commenced in November 1987 and was completed some seven months later at an overall cost of $A25 million. Since commissioning in May 1988 the treatment plant has exceeded design tonnage, availability and recovery. A second expansion programme in January 1989 will increase plant capacity to one million tonnes per annum with associated bullion production of 80,000 ozs per annum.
Contributor(s):
M Hine, P Belby, A Goode, M Wardell-Johnson
-
Wirralie Gold Mine A Case StudyPDFThis product is exclusive to Digital library subscription
-
Wirralie Gold Mine A Case StudyPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1989
- PDF Size: 0.126 Mb.
- Unique ID: P198903026